Software Engineering and the 4 Causes of Aristotle

I stumbled on the principle of the 4 causes of Aristotle some years ago when I did some reading about cause and effect, leadership and management. The question is: How do we get things done? When do we get things done? And also very important: How do we get things done in the right way?

The Four Causes of Aristotle

Everything what happens has four causes. There are no more and no less. Exactly four. Only if all four causes are present, something can come into existence. That is what Aristotle formulated in one of his most famous books: Physica. (Have also a look here: http://en.wikipedia.org/wiki/Four_causes)

In the next sections I describe the four causes. These causes appear in the order I present them. To give an accessible example, I use the picture of building a house. You will see how the four causes apply there.

Causa Finalis: The final cause

The causa finalis or final cause is the basic reason for anything to happen. You can also translate it as need, requirement or wish. Only with something like that a trigger is present to start some development.

For our house building example, we can think of it like the need to move into a new place because of a lack of space. For instance, a couple lives in a small flat and they are happy, but a child is to be born. They found out, that with a small child the place is too small, there is not a good chance to have a children room, the bath room is to narrow… They find that the current situation is changing and a need for more space is coming up.

This is the causa finalis. A need or requirement which is not detailed, yet. There is just an issue to be solved, but there is not a detailed plan, yet. But, the final result is formulated. In our case: More space.

Causa Formalis: The form

After the causa finalis is met, the second cause happens: The causa formalis or form. The final cause showed an issue and its final abstract solution and now it is thought about it and a plan or form is formulated. The causa formalis brings the vision for how the cause finalis can be solved.

In the house building example, our couple may have thought about renting the flat next to them and re-modelling a wall (what is maybe not allowed by the owner), moving into a bigger flat (which might be too expensive), or to build a house. Maybe, after deciding to build a house, they go to an architect and plan how large the house will be, what it will look like, and so forth. At the end of this process a clear vision exists how the situation is to be solved. After the abstract final result, more space, the plan has now a real, detailed form, but is still not physical, yet.

Causa Materialis: The material

After a clear vision exists due to the causa formalis, this vision needs to come to the final solution somehow. For that the last two causes are needed. The very next is the causa materialis or the material. For anything to happen, the material needs to be present or in other words: The bondary conditions need to be met.

In the house building example, the material is the material to build the house likes stones, concrete, wood and so forth, but also the knowledge on how to build it. The physical material is needed, what is obvious, but also the knowledge. Without these, there is no chance that a house can be build.

As boundary conditions other stuff is needed as well like some ground to put the house onto, time to build it and so forth. This is also part of the causa materialis.

Causa Efficiense: The execution

After the needs started the process, the vision was formed and the material was organized, the last cause is the execution or causa efficiense. A trainer of mine told me once: A vision without execution is just hallucination. He is right. One can dream of the best stuff, to have everything in place and so forth, but without execution nothing happens. That’s what the last cause is about. In this meaning, it also links to the block post I wrote some years before about The Trinity of Action.

In the house building example, this is the actual building of the house. We have everything in place now to perform the actual solution. We have the need to give as drive and energy, we have a vision and plan, we have the material and knowledge, and the last step is to put the material together with the knowledge we have to get the actual house build.

The Dependencies of the Four Causes

The four causes are sorted in another order in most cases, but in my opinion this is not optimal. There is a strict order of appearance in the order I described it above.

The first cause in my opinion is the causa finalis. It is a natures principle that without energy nothing takes place. Without the need, requirement or issue, there is no energy to change a current status quo. There is always a causa finalis needed as a seed for any change. I cannot think of a situation where it is different.

The second cause after the seeding by the causa finalis is always a kind of plan. A lot of actions in our world seem to be performed without plan, but the closer look reveals, that even there is a plan, but maybe not a well thought through one or just based on a pattern or experience, but there is one.

The cause materialis may be also the second reason, because the material might be already there for the solution, but it is not seen as such without a kind of plan. On the other side a plan also reveals what material might be missing which is needed to be organized or waited for.

At the very end the action, the causa efficiense can take place, but without a plan or material nothing can be done.

The principle of the Four Causes helps me a lot during my daily private and professional life, because it helps me to understand what happens on one site, but it also provides me a guideline on how to work in certain situation, because it gives me an order for what to work on.

The 4 Causes in Software Engineering

There is not so much to write anymore. In Software Engineering, this principles are at work as well.

At first a customer has a need to be solved which lead into some requirements which are the causa finalis. It is formulated what the final outcome has to be. After that architectural and design papers are written and planning done which are the causa formalis. With the organization of hardware, software, developers, office space and everything else, the boundary conditions for the actual development are met. The final development is the causa efficiense.

The trick is to reflect the current status of a software project from time to time and think about the four principles to find out, whether all causae are there. If something is missing, the project cannot be finished successfully:

  1. Is the causa finalis not met, no customer will pay due to a lack of need.
  2. Is the cause formalis not met, no customer will pay, because it is not useful.
  3. Is the cause materialis not met, the product cannot be developed, shipped or run. Again, nobody will pay.
  4. At least, if the causa efficiense is missing, the actual product is not build and cannot be sold either.

That’s all the secret in here…

The Curse of Cp and Cpk

In factory automation the calculations of Cp (Process capability index) and Cpk (measure of process capability) values are a good tool to monitor and proof performance and quality. I do not give here the full theory for the calculation of Cp and Cpk and all the math behind it. I want to show some issues from my professional experience which arise in understanding and also in expectations.

Some Theory for Recapitulation

For a given process measurements are performed and for a single parameter the average (Avg) and the Standard Deviation (StdDev) are calculated. The Cp and Cpk values are calcualted in the following way:

Cp = (USL – LSL) / (6 * StdDev)

Cp,upper = (USL – Avg) / (3 * StdDev)

Cp,lower = (Avg – LSL) / (3 * StdDev)

Cpk = Min(Cp,upper, Cp,lower)

The Cp value gives the theoretical capability of the process. It assumes a centered production and evaluates the best possible outcome for the given process deviation. This is the target to reach for process centering. The Cp value it self should be maximized with minimizing process deviation.

The Cpk value gives the current process performance and takes also into account if the process is not centered. If the process is centered the equation Cp = Cpk is valid.

For a Six Sigma production, values of Cp=2.0 and Cpk=1.5 are expected. The theoretical process capability should show a process deviation which matches six times into the process specification. A normal variation of the process around its center is always present and can not be avoid completely. Therfore the long time Cpk value is allowed to be smaller due to experiences of process variations in field of 1.5 sigma around the target.

If everything is Six Sigma ready, one gets only 3.4 violations of the specification into each direction out of one million samples. That means 6.8 violations in total for one million samples.

The Issue of Normal Distribution

The first issue and seldom questioned is: „Are my parameters normally distributed?“

In reality I have seen processes with Cp and Cpk values smaller than expected or wanted, but without any fail. The reason is that the parameters used are not normally distributed and the caluculations and statistics go fail. One can think of a rectangular distribution which is always within specification, e.g. between LSL/2 and USL/2. The calculation of Cp and Cpk give a Sigma level which tells to have a messy process. But in reality everything goes fine and no violation is to be expected. Only the math gives numbers out of wrong expectations.

A gate oxid growth for example can not be normally distributed due to the impossibility of negative gate oxid thicknesses. Processes which are under SPC (Statistical Process Control) control where corrective actions are performed, can also not be normally distributed. The influence of the corrective actions destroy the normal distribution if it were present before-hand.

One should always do a test for normal distribution first before calculation Cp and Cpk. In reality only a few processes are quite well normally distributed and for them the normal Cp and Cpk measurements are suitable. In most processes one should use different distributions for calculations or better do a counting of violations and a calculation back to a Sigma level. Those gives better information about real processes.

Hunting for Cp and Cpk

In a lot of industries, quality is one of the most important values and in some even life saving like in aerospace, automotive and medical industry. The pressure to reach and proof quality is very strong and necessary to stay in business and to challenge ones competitors. Cp and Cpk values are crucial for all purposes.

Cp and Cpk strongly depend on the specifications used. This leads to the next section…

Setting the Limits

When it comes to customer satisfaction, good Cp and Cpk values are important goals. It’s sometimes hard to reach them technically, but choosing the right limits can help. I heard, that the specification limits can be adjusted to meet Cp and Cpk value requirments and that these limits do not have any restrictions due to the fact that the process is controlled trougth its control limits. I knew afterwards I have to write about the right limits. Even a professional consultant on this mentioned something like that and I could only explain why there are technical limits for process and quality engineering.

At first we should define which limits are available for process control and what the purposes of them are.

Functional Limits

These limits define within which limits the product is suspected to work. Outsite these limits the product is just waste, not to be used and therefore to be dumped. There is nothing more to say… 😉

Specification Limits

These limits are negotiated with the customers or internal limits which are defined to decide whether a product is to be delivered or not. Specification limits can be defined multiple times for different customers, markets or functions, because not all product purposes need the same quality. The only requirement is, that the specification limits are equal to the functional limits or smaller within the functional limit range. A product which does not work at all is not suitable for any market except for selling to waste recycling.

Control Limits

Control limits are used for triggering corrective actions. If the process runs out of the control limits, a production system should signal this event immeditially and someone responsible has to start corrective actions to get the process back to target or the deviation back to a normal level. The control limits need to be defined left and right (or above and below) the target to make sense for corrective actions. For the purpose to start corrective actions, the control limits also have to be defined between the specification limits. If the control limit triggers an event outsite specification, it’s too late for any meaningful actions. Several control limits can be defined if necessary to separated different levels of escalation or different levels of inversive corrective actions.

Relationship of Limits

Regarding the facts above there is a simple relationship between all these limits which can be written as:

UFL >= USL > UCL > TARGET > LCL > LSL >= LFL

Shortcut Name Meaning
UFL Upper Functional Limit The upper limit for the product to work properly
USL Upper Specification Limit The upper limit of the product specification as delivery criterium
UCL Upper Control Limit The upper control limit as trigger for corrective action
TARGET Target The production target and optimum goal for production
LCL Lower Control Limit The lower control limit as trigger for corrective action
LSL Lower Specification Limit The lower limit of the product specification as delivery criterium
LFL Lower Functional Limit The lower limit for the product to work properly

The Curse Revealed

Where is the curse now in all this? Everything is well defined and we do the right statistics!?

In reality, most parameters are not normally distributed and the calculation of Cp and Cpk give numbers implying a worse process than really present. The numbers do not look very well because of wrong asumptions of normal distributions. The correct calculation is difficult and only statistics based on event couting is really accurate, but the number of events for counting need to exceet the 1 million mark, which is not really practical.

Customers also want Cp and Cpk values which do have a well defined sigma level like 3 (Cp = 1.0), 4 (Cp = 1.33), 5 (Cp = 1.67) or 6 (Cp = 2.0). The specification limits can only be expanded to functional limits and the process has to have a deviation and variation to meet this goal which is sometimes not really meetable due to physical constraints of machines or processes. Sometimes the process capability can not be proofed accurately with Cp and Cpk values.

In semiconductor industry for example one has to deal with physical issues. For an 8nm tunnel oxid for example one has to grow a layer of roughly 30 atoms to meet the thickness. The specification is set to 8nm +/- 1nm. 1nm is roughly 4 atoms. To meet the Six Sigma level one has to have a process deviation of a 6th of this 4 atoms, which is 2/3 of an atom. Therefore, to meet the Six Sigma level one has to prepare with a process variation of 2/3 of an atom and that in a process which processes a whole 8 inch wafer. For the whole area only a 2/3 of an atom of variation is allowed. These kind of tunnel oxids are prepared in 0.6um technologies. The current technologies in CMOS go down to smaller than 0.03um and the tunnel oxids become thinner and thinner… We obviously meet the physical limitations here.

What can be done, when customers have their expectations and the physics is at its end? Sometimes there is a real gap between needs, expectations and physical capabilities.

Solution

Sometimes we have to slow down, to sit together and to discuss in detail and technically correct what’s going on. If the Cp and Cpk values are used for production control, it’s a good step, but the blind hunt for numbers is not leading to the final target: Quality. The numbers are not always correct and the expectations have to be adjusted to the reality. Every production process should be optimized for best possible and effortable quality, but this has to be made transparent to external and internal customers of manufactoring parameters.

For managers, engineers and customers, there should be open discussions and if needed trainings to get background knowledge to get into constructive discussions and decision making procedures. Otherwise there is a large potential for professional conflicts…